A strong Delivering at Pace example, step by step
A strong Delivering at Pace answer is one real piece of work with a deadline, where something put that deadline at risk and you got it back on track. Pace means organised, not just fast.
This page shows the answer most people write next to the one that scores, part by part, then the full answer and how to reuse it for another question.
What the behaviour is asking for
Delivering at Pace is one of the nine Civil Service behaviours in Success Profiles. GOV.UK sums it up as: “Take responsibility for delivering timely and quality results with focus and drive.” Timely and quality: the panel wants both, not one at the cost of the other.
At Administrative Officer (AO) level, GOV.UK's lines include “keep managers and stakeholders updated on how work is progressing”. At Executive Officer (EO) level, one line is “regularly check performance against objectives”. So the strongest answers show a plan, a check on progress, and a fix when it slipped.
Your example doesn't have to come from an office job. Success Profiles says it might be at work or somewhere else, such as work experience, volunteering, a hobby or a dissertation deadline. The example below is made up, but the shape works for any job with a deadline.
Behaviours are usually scored out of 7. The advert or candidate pack sets the pass mark, and 4 is common. The lines below show what a high score looks like.
Each part: what most people write, and what scores
Your answer has five parts: Situation, Task, Action, Result and Reflection (STARR). For each one, here is the line most people write, the line that scores, and why. Spend most of your words on the action: around 150 words in a 250-word answer.
Situation: show the deadline was at risk
“I work in a fast-paced team and we always have lots of deadlines.”
“We had 3 weeks to move 400 customer records onto a new system before the old one was switched off. After week 1 we'd moved 60, so we were on track to miss it.”
Why it scoresThe first describes your job, not a moment. The second gives a real deadline, a number and a risk. Without a risk, there is nothing for you to deliver at pace.
Task: say what you had to deliver
“I needed to work hard to get it done.”
“I had to get every record moved on time, without errors that would lose anyone's bookings.”
Why it scoresThe second names the deadline and the quality bar in one sentence. That matches the behaviour's own words: timely and quality.
Action: where the marks are
“I stayed late every night and worked through my lunch breaks until it was done.”
“I timed one record and found 1 field was slowing us down, so I asked IT to copy it across. I split the work so we didn't overlap, set a daily target, and checked our count every afternoon. When a colleague fell behind, I took 20 of her records.”
Why it scoresWorking longer hours isn't a plan, and the panel can't score it. The second shows you found the barrier, organised people, checked progress against a target and supported a colleague: the GOV.UK lines, in plain words.
Result: on time, and still right
“We got it done in the end and my manager was happy.”
“We moved all 400 records 2 days before the switch-off. Spot checks found 6 errors, all fixed before go-live, and no customer lost a booking.”
Why it scoresThe first could mean it was late. The second proves timely (2 days early) and quality (errors caught and fixed). Rough numbers are fine if they are honest.
Reflection: one thing you'd change
“I learned that I work well under pressure.”
“Next time I'd time the work on day 1, not after a week. Spotting the slow field earlier would have saved the first week's panic.”
Why it scoresThe first is a claim about yourself. The second is specific, honest about your own part, and shows you'd plan better next time.
The full answer
Moving 400 records before a system switch-off
Our team had 3 weeks to move 400 customer records onto a new booking system before the old one was switched off. At the end of week 1 we had moved 60, and at that rate it would take nearly 7 weeks, not 3.
I was given the job of getting every record moved on time, without errors that would lose anyone's bookings.
I timed one record and found most of the delay came from 1 field that had to be retyped by hand. I asked IT whether it could be copied across, and they set that up in 2 days. I split the rest by surname so 4 of us weren't working on the same records, and set a daily target of 10 each, 40 a day for the team. Every afternoon I checked our count against the target. When one colleague fell behind because her records were the oldest and messiest, I took 20 of hers. I spot-checked 1 in 10 records for mistakes, and sent my manager a 3-line update every Friday.
We moved all 400 records 2 days before the switch-off. Spot checks found 6 errors, all fixed before go-live, and no customer lost a booking.
Reflection: Next time I'd time the work on day 1, not after a week. Spotting the slow field earlier would have saved the first week's panic.
Tips that make the difference
- Pace is a plan, not overtime
Long hours and skipped breaks don't show the behaviour. Show how you organised the work so it got done on time in normal hours.
- Show the risk
If the deadline was never in doubt, there's nothing to score. Say what put it at risk: a slow step, people off, a late change.
- Check, then act
Say how you tracked progress (a daily count, a weekly check) and what you changed when it slipped. That is the EO line about checking performance against objectives.
- Keep quality in the story
Say how you made sure fast didn't mean sloppy: spot checks, a second pair of eyes, following the rules for the work.
- Keep people updated
One line on who you kept informed, and how often, covers the AO line about updating managers and stakeholders.
- Say “I”, not “we”
Give the team's part in one line, then spend the rest on what you did. The panel can only score your actions.
Use the same example for another question
Write your example as blocks first: one sentence each for the risk, each thing you did, the result and what you'd change. For a different question, keep the blocks and change which actions go in the middle.
In one application, try to use a different example for each behaviour. Blocks help most at interview, when a follow-up comes and you already know which part of your story answers it.
Changing and Improving: tell me about a time you found a better way of doing something.
Lead with the slow or clumsy way it was done, then how you spotted the problem, what you suggested and what changed.
Moving each record meant retyping 1 field by hand. I timed one record, saw that field took most of the time, and asked IT whether it could be copied across. They set it up in 2 days. After that we hit our daily target, and we moved all 400 records 2 days before the deadline.
What to do next
Before you write yours
6 to doTonight, think of one deadline that nearly slipped: at work, at uni, or in something you organised. Write it as blocks, then build the answer above around it. To use one example for several questions, see the guide on whether one example can answer any question.
If your example is old or from outside work, the returners guide shows how to make it count.
Plum matches you to live Civil Service jobs, shows which behaviours each one tests, and helps you write and practise your examples. You apply on Civil Service Jobs itself.
Common questions
What is Delivering at Pace in the Civil Service?
It is one of the nine Civil Service behaviours in Success Profiles. GOV.UK describes it as taking responsibility for delivering timely and quality results with focus and drive: planning work, checking progress, dealing with setbacks and keeping people updated.
What is a good example of Delivering at Pace?
One real piece of work with a deadline that was at risk, where you planned the work, checked progress against a target, fixed what was slowing it down and still finished on time and to a good standard. System changes, backlogs, events and coursework deadlines all work well.
Does working overtime count as Delivering at Pace?
Not on its own. Staying late shows effort, not organisation. The panel wants to see how you planned, prioritised, removed blockers and checked progress so the work got done on time.
Can my Delivering at Pace example come from outside work?
Yes. Success Profiles says examples can come from work experience, volunteering or a hobby. A dissertation, a group project or an event you organised all count, as long as there was a real deadline and you say what you did.
How long should my answer be?
As long as the advert's word limit, often 250 words per behaviour. Keep the situation and task to two or three sentences, spend most of it on what you did, and finish with the result and one line of reflection.
What score do I need to pass a behaviour?
Behaviours are usually scored out of 7, and the pass mark is set in the advert or candidate pack. 4 is common. Some adverts sift on a lead behaviour first, so check which one is named as lead.